Dewatering

IDOT Bid Order 001 Iowa 2

Mersino handled the dewatering for Ames Construction’s IDOT Bid Order 001 Levee Expansion Project, using four systems to manage groundwater. Despite challenges like flooded areas and high water tables, we overcame obstacles with contractor support and are nearing project completion.

placeholder

Dewatering

BP Whiting Refinery

MERSINO secured a contract for ongoing dewatering services at BP’s largest refinery, leveraging our expertise and competitive bid. Since 2011, we have managed around 3,000′ of wellpoints, using manual installation to handle the site’s challenging marshy conditions effectively.

placeholder

Dewatering

Anhydrite Pond #9 Chlorides Wash

MERSINO successfully demonstrated the feasibility of washing chloride from the #9 pond at the Big Hill Federal Oil Reserve and was contracted for the full decommissioning. Despite challenges like limited equipment access, extreme weather, and wildlife, the team installed 700 wellpoints by hand and is now awaiting final compliance testing.

Dewatering

Advocate Illinois Masonic Hospital

Despite the confined work area and noise restrictions, we successfully ran our jetting hoses through various points in the hospital’s outside walls while maintaining a 24/7 Operator Pump Watch. Our discharge system efficiently managed groundwater through a custom-fitted storm drain, earning positive feedback from Boldt Construction and hospital staff for our professionalism and problem-solving abilities.

placeholder

Bypass Pumping

Wyandotte Plant Intake Bypass

Mersino provided temporary pumping services during the construction of a new river water sump for a site in Wyandotte, Michigan. Due to the urgent need to install the system in time to continue critical operations at the plant, Mersino crews worked split shifts for 4 straight days to complete installation in the required time frame.