Trenching

Green River Wind Farm

Mersino was selected for dewatering services at Green River Wind Farm based on our performance at Walnut Ridge Wind Farm. We installed 6,800 feet of wellpoints and managed sandy soil conditions with a variety of pumps and equipment, overcoming weather challenges to complete the project on time and on budget.

Trenching

Brightline Rail East

Mersino is dewatering the east-west portion of the $2.5 billion All Aboard Florida project, which will feature high-speed Brightline trains. We have installed over 30,000 linear feet of sock tile and are using various pumps to manage the dewatering for this new rail system.

placeholder

Dewatering

Raw Water Intake Structure Site

MERSINO installed a deep well dewatering system for the Plant Vogtle Nuclear Power Plant’s water intake structure, managing challenging site conditions and hydrostatic pressure with a B180 Casagrande drill rig.

placeholder

Dewatering

Temporary Dewatering

MERSINO installed a two-tiered dewatering system for a hydroelectric power plant project at Smithland Lock and Dam on the Ohio River. The system included 65 wells, up to 150 feet deep, and was capable of handling up to 78,000 GPM to support the excavation for the powerhouse and channel, ensuring successful operation.

Dewatering

Siesta Key 89 Beach

Mersino installed a 620-foot wellpoint dewatering system, discharging into the Gulf of Mexico. Despite challenges from tides and wildlife, the team secured the discharge pipe with concrete anchors, completing the project successfully and on time.